The week you get your keys is the most important week of your whole two-year warranty. Cosmetic damage usually has to be reported within about 7 days, and the one chance to inspect an empty house disappears the moment the removals van pulls up. Here's the plan — what to do on the day, what to ask at handover, and what to check before a single box comes in.
Snagging isn't one job — it's a sequence, and the order matters. Each window below protects you from a different way of losing a free fix.
Take meter readings the moment you're in, and photograph them. Do the handover demonstration with the site team, ask the questions below, and don't be rushed — this is also your first look at the finish. Note anything you spot, but don't worry about being exhaustive yet.
This is the single most valuable hour of the whole process. In an empty house, with daylight, walk every room and log every chip, scratch, crack and cosmetic fault — because once your removals company has been through, the builder can (and often will) suggest the damage came in with the furniture. If you can, snag the day before the van arrives.
Most builders and warranty terms expect cosmetic damage — chipped worktops, scratched glass, dented doors, marked baths — to be reported within about 7 days of completion. Finish your full room-by-room pass and send the complete, photographed list to the builder in writing before this window closes.
Some defects only show up in use: a radiator with a cold spot, a draught under a door, a socket that doesn't grip, slow drains, doors that swell. Keep adding to the same list and report new items in writing as they appear — you don't need to save them up.
New homes dry out and settle, so hairline cracks and sticking doors often appear over the first year — most are normal, but anything beyond minor shrinkage belongs on the list. Do a final full inspection a month or two before your two-year builder period ends, so nothing misses the deadline.
Most builders walk you through the home when you collect the keys. It's easy to nod along in the excitement — instead, get answers to these while the site team is standing in front of you:
The last two are the ones people skip and regret. Get the snag-reporting route in writing — a named inbox or portal — so your list never disappears into a site manager's pocket notebook.
If you do nothing else from this page, do this. One hour in the empty house, phone in hand, before the removals van arrives:
Then, in the days that follow, work through the full room-by-room snagging checklist and send the builder one complete, photographed list — in writing — before the 7-day window closes.
Under the New Homes Quality Code, registered developers are expected to resolve reported snags within around 30 calendar days unless there's good reason. Track what's fixed, chase what isn't, and keep adding new defects as they surface — the builder remains responsible for defects for two full years. How that cover works, and what changes after year two, is covered in our guide to new-build warranties.
And if the builder stops responding? Escalate in writing, then take it to the New Homes Ombudsman Service or your warranty provider's resolution service — both free, and both driven by exactly the dated, photographed evidence you've been building since day one.